General steps for operating a self loading concrete mixer car

September 26, 2024

General steps for operating a self loading concrete mixer car

Preparation

1. Check the vehicle: Make sure all parts of the vehicle are normal, including the hydraulic system, mixing tank, control system, tires, braking system, etc.

2. Understand the operating manual: Familiarize yourself with the vehicle's operating manual and understand all operating steps and safety regulations.

3. Wear safety equipment: Wear necessary personal protective equipment, such as hard hats, reflective vests, safety shoes, etc.

 

Operation steps

1. Start the vehicle:

- Turn the ignition switch to the start position and start the engine.

- Check the dashboard to ensure that all indicators are normal.

 

2. Loading:

- Drive the vehicle under the hopper and open the feed port of the hopper.

- Use the on-board control system to lift the hopper to the feed position and start loading.

- Control the feed speed to avoid overflow.

 

3. Mixing:

- Start the mixing function of the mixing tank while loading or after loading.

- Adjust the mixing speed and time according to the requirements of the concrete.

 

4. Transport:

- Close the hopper and drive the vehicle to the construction site.

- During driving, maintain a steady speed and avoid sharp turns and sudden braking to prevent concrete segregation.

 

5. Unloading:

- After arriving at the construction site, park the vehicle in the designated location.

- Use the tilting function of the mixing tank to unload the concrete to the designated location.

- The position and speed of unloading can be adjusted by controlling the rotation direction and speed of the mixing tank.

 

6. Cleaning:

- After unloading, wash away the remaining concrete and dirt.

- Rinse the mixing tank with clean water until it is clean.

 

Safety precautions

- Follow all safety regulations and operating instructions.

- Stay alert during operation and pay attention to the surrounding environment and people.

- Make sure the vehicle is operating on stable ground to prevent rollover.

- Before performing any maintenance or inspection, make sure the engine is turned off and all moving parts are stopped.

- Do not overload and comply with the vehicle's load limit.

 

End of operation

- Confirm that the vehicle is clean and there is no concrete left.

- Check whether all parts of the vehicle are normal and record any matters that need repair or attention.

- Park the vehicle in the designated location and prepare it for next use.

 

Xinyu Machine-Concrete Batching Plant for Sale|Concrete Mixing Plant|Concrete Mixer|Hot Mix Plant|Asphalt Plant near me